Assigning Timing Constraints

Once the Blocks have been grouped satisfactorily, then scheduling constraints can be assigned to each Zone for each planning period. There are three options for the 'Scheduling mode': Green, Yellow and Red. By selecting a colour in the 'Scheduling mode' that particular constraint can be assigned to the cells in the Editor. Constraints are not assigned to the individual managed Blocks until the 'Apply' button is used.